1 00:00:05,269 --> 00:00:03,110 nasa is developing the capabilities to 2 00:00:07,190 --> 00:00:05,279 send people into deep space to 3 00:00:09,350 --> 00:00:07,200 accomplish this we need to extend our 4 00:00:11,509 --> 00:00:09,360 knowledge of how to operate in space 5 00:00:13,350 --> 00:00:11,519 nasa is developing habitation systems 6 00:00:15,749 --> 00:00:13,360 that provide safe and sustainable 7 00:00:17,430 --> 00:00:15,759 space-based living quarters workspaces 8 00:00:19,830 --> 00:00:17,440 and laboratories 9 00:00:22,070 --> 00:00:19,840 expandable habitats are one option these 10 00:00:24,070 --> 00:00:22,080 potentially weigh less and occupy less 11 00:00:26,310 --> 00:00:24,080 volume on a rocket while allowing for 12 00:00:28,230 --> 00:00:26,320 additional space for living and working 13 00:00:29,990 --> 00:00:28,240 however testing needs to be done on the 14 00:00:31,269 --> 00:00:30,000 design performance of expandable 15 00:00:33,910 --> 00:00:31,279 habitats 16 00:00:36,310 --> 00:00:33,920 the bigelow expandable activity module 17 00:00:38,709 --> 00:00:36,320 or beam developed under contract with 18 00:00:40,790 --> 00:00:38,719 bigelow aerospace provides a test 19 00:00:42,790 --> 00:00:40,800 platform for demonstrating the thermal 20 00:00:45,190 --> 00:00:42,800 structural radiation performance 21 00:00:49,270 --> 00:00:45,200 mechanical durability and long-term leak 22 00:00:52,950 --> 00:00:51,029 the beam will be transported to the 23 00:00:55,590 --> 00:00:52,960 international space station inside the 24 00:00:57,430 --> 00:00:55,600 spacex dragon supply vehicle's trunk 25 00:00:59,189 --> 00:00:57,440 once dragon is birthed to the space 26 00:01:01,349 --> 00:00:59,199 station flight controllers at mission 27 00:01:03,750 --> 00:01:01,359 control in houston texas will maneuver 28 00:01:05,750 --> 00:01:03,760 the station's robotic arm to extract 29 00:01:07,910 --> 00:01:05,760 beam and attach it to the rear port on 30 00:01:10,070 --> 00:01:07,920 the tranquility node after all 31 00:01:12,390 --> 00:01:10,080 preparations are complete crew members 32 00:01:14,230 --> 00:01:12,400 will begin inflating the structure this 33 00:01:16,550 --> 00:01:14,240 will be the first time an expandable 34 00:01:18,710 --> 00:01:16,560 habitat has been deployed on station so 35 00:01:20,950 --> 00:01:18,720 the procedure will take place slowly to 36 00:01:22,950 --> 00:01:20,960 closely absorb the expansion process and 37 00:01:23,990 --> 00:01:22,960 maintain the safety of the crew and the 38 00:01:26,310 --> 00:01:24,000 station 39 00:01:29,429 --> 00:01:26,320 during this time beam will expand from 40 00:01:32,310 --> 00:01:29,439 its packed dimensions of 5.7 feet long 41 00:01:34,390 --> 00:01:32,320 and just under 7.75 feet in diameter to 42 00:01:37,190 --> 00:01:34,400 its pressurized dimensions of 12 feet 43 00:01:39,590 --> 00:01:37,200 long and 10.5 feet in diameter 44 00:01:42,230 --> 00:01:39,600 once beam is fully expanded the crew 45 00:01:44,310 --> 00:01:42,240 will pressurize it and test it for leaks 46 00:01:46,310 --> 00:01:44,320 after this beam's pressure will be 47 00:01:48,149 --> 00:01:46,320 equalized with the station pressure and 48 00:01:49,670 --> 00:01:48,159 the crew will enter the beam and install 49 00:01:53,910 --> 00:01:49,680 sensors 50 00:01:56,069 --> 00:01:53,920 autonomously collect thermal impact and 51 00:01:59,670 --> 00:01:56,079 radiation data throughout the two-year 52 00:02:03,350 --> 00:02:01,510 these experiments will help determine 53 00:02:05,910 --> 00:02:03,360 whether expandable structures will